Jackson Boulevard Phase 1

 
  • Project Manager: Evan Walterman
  • Superintendent: Perry Van De Steeg
  • Owner: City of Spearfish

Jackson Blvd Phase 1 included a wide range of work from street and utility construction of nearly 10 blocks on one of the busiest roads in Spearfish, as well as asphalt/concrete surfacing, decorative median islands and landscaping. The project started with a several large storm water structures to filter stormwater before entering Spearfish Creek and continued up Jackson Blvd 9 blocks towards the Interstate bringing new storm sewer mains up the road. Crews had to fight rain and wet conditions but were able to maintain steady productions and get the storm sewer finished on time. It was a race against weather to get more than 5,000 Tons of asphalt laid over the entire project. Currently, crews are putting on the finishing touches on Phase 1.